--- title: "SVSTUG News" type: "article" slug: "svstug-news-2" url: "http://localhost/article/svstug-news-2/" markdown_url: "http://localhost/article/svstug-news-2.md" published_at: "2026-03-14T13:36:26+00:00" modified_at: "2026-03-14T13:36:27+00:00" featured_image: url: "http://localhost/wp-content/uploads/2022/04/20230809-041332.jpg" excerpt: "April 1986 SVSTUG meeting notes: interest in ZEBRA Systems modem deal high (18 of 20 units from Ledra Systems worked); Bill Miller demoed Damco Wafadrive hooked to Spectrum; Terry Greenlee and David Gray borrowed Spectrums and Waferdrives loaned by A&J Microdrive to work on 2050 modem compatibility; Dan Mowrey brought copy of MTERM for SVSTUG…" category: - name: "Timelinez" slug: "timelinez" taxonomy: "category" url: "http://localhost/category/periodicals/timelinez/" post_tag: - name: "User Group Minutes" slug: "user-group-minutes" taxonomy: "post_tag" url: "http://localhost/tag/user-group-minutes/" indiv: - name: "Bill Miller" slug: "bill-miller" taxonomy: "indiv" url: "http://localhost/indiv/bill-miller/" publication_r: id: 21571 title: "Timelinez" type: "periodical" url: "http://localhost/periodical/timelinez/" authors_r: - name: "Bill Miller" slug: "bill-miller" taxonomy: "indiv" url: "http://localhost/indiv/bill-miller/" volume: "4" issue: "4" issues_articles: - id: 38833 title: "Timelinez v4 n4" type: "issue" url: "http://localhost/issue/timelinez-v4-n4/" pages: "7" pubdate: "April 1986" archive_link: false --- April 1986 SVSTUG meeting notes: interest in ZEBRA Systems modem deal high (18 of 20 units from Ledra Systems worked); Bill Miller demoed Damco Wafadrive hooked to Spectrum; Terry Greenlee and David Gray borrowed Spectrums and Waferdrives loaned by A&J Microdrive to work on 2050 modem compatibility; Dan Mowrey brought copy of MTERM for SVSTUG use; Dale Ahlstrom searched SVSTUG 1981-1982 newsletter exchange for TS1000 articles. Seeks Kempston-compatible joystick interface schematic (Steve Wyatt’s version from G. Russell Electronics suggested). Cupertino Library to be closed 6 months to a year for expansion; new meeting location needed after January.