Authors
Publication
Pub Details
International QL Report V5 I1
Volume:
5
Issue:
1
Date
May/June 1995
Pages
48
See all articles from International QL Report V5 I1
Eros Forenzi’s article on operating speeds (IQLR 4-6) got me to thinking about timings other than those shown. For instance, only three of the four cache and second screen combinations are shown and SMSQ/E is not covered. The following constitutes my feeble efforts to date.