Volume: 2
Issue: 9
Articles
- October News from The T/S ConnectionAERCO has set target date of Oct. 30 (1985) for completion of 2068 drive interface. Smart II terminal program arrived.
- Outlook Bright?One recent evening, I arrived home to find a rather thick envelope from a company called Ramex. Inside was a number of pieces of advertising for add-on products to the Timex 2068 computer.
- The Unknown ProgrammerShort program to draw mountains; two line sound program.
